Bulk Equipment, Bulk Industries, Construction, Equipment & Technology, Latest News

Boral trials recycled end-of-life solar panels

The sustainable concrete blend is undergoing trials ahead of use in major North East Link project. Image: Boral

Boral has trialled a new recycled sand for concrete using crushed glass from end-of-life and damaged solar panels.

Currently undergoing trials, it has been specifically created for Victoria’s North East Link project, the biggest-ever infrastructure investment in Melbourne’s north-east which will construct 6.5 kilometres of tunnels.

Solar glass sand is an environmentally sustainable replacement product to traditional sand, a natural diminishing resource essential to the building and construction industry.

The innovation was driven by Spark North East Link Design & Construct Joint Venture (“Spark”), a consortium comprising world-leading construction companies and one of Australia’s largest road and tunnel operators – who has engaged Boral’s expertise to produce and trial concrete with the solar glass sand. The University of Melbourne supported SPARK with development and testing.

Related stories:

“We’re excited to be leading the development of concrete mixes containing solar glass sand, an innovative new product that will be used in Victoria’s biggest project in history. The success of this sustainable concrete mix in a commercial project provides an effective pathway for recycling of end-of-life solar panels and contributes further to sustainability of the construction and building industry,” Dr Ali Nezhad, head of sustainability and innovation at Boral said.

Boral sourced the glass from ElecSome, an Australian solar panel upcycling plant that collects end-of-life or damaged solar panels. The glass was crushed and processed at Elecsome’s recycling facility, then blended with up to 50 per cent natural sand.

A variety of concrete mixes using solar glass sand have been created by Boral. Test loads of concrete were transported from the Tullamarine plant to its recently opened Bulleen Concrete Plant, which supplies concrete to the North East Link project, and a trial concrete slab has been laid on site.

Boral has assessed plastic properties including consistency and finishing and has undertaken hardened property testing for compliance with relevant standards. Results so far have been excellent.

Send this to a friend